• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Varlowe Industrial Services

Varlowe Industrial Services

Welding, Fabrication, CNC, Gas And Pipework Specialists

  • Home
  • About Us
    • Projects
  • Services
    • CNC Machining
      • CMM Inspection Services
      • CNC Turning Services
      • CNC Milling Service
    • Electrical Services
    • Commercial Heating Service
      • Commercial Gas Engineers
    • Industrial Gas Services
      • Gas Pipework
    • Mechanical Services
      • Industrial Gearbox Repair And Refurbishment
      • Motor Repair, Refurbishment, and Rewinds
    • Pipework Fabrication
      • Pipefitter
    • Steel Fabrication
    • Welding Services
      • Coded Welding
      • Mobile Welding Service
  • Gallery
  • Blog
  • Contact Us
  • 01902 861042

Polar Technology – New Gas Supply Phase 1

Project Description

Polar Technology required a new gas line installation to support a new oven at their Oxford-based workshop.

The management group delivers technology-based products around advanced composite materials, emerging metal processes and metallic fabrications through Lentus Composites and SST Technology.

They reached out to us to help them prepare for a new oven due to be installed. After a site meeting, we identified the need and came up with a solution.

After a detailed site measure, Phase one of the project was to supply, manufacture and install a new 4” stainless steel metric gas main.

The new main is installed at a high level, terminating with 3” blanked valved for further use. We then extended into the plant room and ended at a low level. The final part was then to connect to the burner on the new oven, complete with all isolating and test and purge points.

We prefabricated the required pipework in Varlowe’s workshop, ready for delivery to the site.

Once the prefabricated pipework was on-site, our site engineers started installing the new mains, following all site rules and regulations.

All work to be carried out by Gas Safe engineers to IGE/UP/1 edition 2 and class one coded welders.

On completion, all work was tested at 11/2x working pressure with bottled nitrogen and purged air to gas and certified.

Phase 2 of the project is due to start in the near future which will include a new high to low level gas run feeding the new purpose plant, all fabricated to customer requirements.

Project Details

Project:

New Gas Supply For Plant – Phase 1

Services Required:

Pipe Fabrication, Gas Services, Coded Welding, Repair, Installation, Project Management

Customer:

Polar Technology

Website:
https://polartechnology.co.uk
21
SHARES
ShareTweet

Filed Under: Projects

Footer

Head Office

Varlowe Industrial Services Limited,
Patrick Gregory Road, Wednesfield, Wolverhampton, Wv11 3du

Phone: 01902 861042
Email: info@varlowe.co.uk

What3Words

what3words address: ///resort.jeeps.recall

Services

  • CNC Machining
  • Coded Welding
  • Commercial Heating Service
  • Electrical Services
  • Industrial Gas Services
  • Pipework Fabrication
  • Steel Fabrication
  • Privacy Policy
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

© 2025 Varlowe Industrial Services Limited - Company Registered in England (04928815)

  • Blog
  • Gallery
  • Projects
  • Get A Quote
  • 01902 861042
  • info@varlowe.co.uk