• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Varlowe Industrial Services

Varlowe Industrial Services

Welding, Fabrication, CNC, Gas And Pipework Specialists

  • Home
  • About Us
    • Projects
  • Services
    • CNC Machining
      • CMM Inspection Services
      • CNC Turning Services
      • CNC Milling Service
    • Electrical Services
    • Commercial Heating Service
      • Commercial Gas Engineers
    • Industrial Gas Services
      • Gas Pipework
    • Mechanical Services
      • Industrial Gearbox Repair And Refurbishment
      • Motor Repair, Refurbishment, and Rewinds
    • Pipework Fabrication
      • Pipefitter
    • Steel Fabrication
    • Welding Services
      • Coded Welding
      • Mobile Welding Service
  • Gallery
  • Blog
  • Contact Us
  • 01902 861042

Aston University Pipework

Project Description

Aston University is an award-winning university located in Aston, Birmingham. 

The university was founded in the 19th century when Birmingham and Midland Insitute created a School of Metallurgy. It became the Birmingham Municipal Technical School in 1895, and several other name changes before Aston gained university status in 1966.

Five schools make up the university: Engineering and Applied Science, Life and Health Sciences, Languages and Social Sciences, the Aston Medical School and the Aston Business School, with around 11,000 students combined.

Aston Business School is ranked in the Top Global 100 for Master’s in Business and Management and is triple accredited – a position held by only 1% of business schools worldwide.

Due to joining the City’s District heating system, the university required a new spine of flow and return Pipework.

We needed to fabricate and install the constant temperature pipework for the district supply.

We pre-fabricated 200m of 8″ pipework back in our workshop. We do this to minimise on-site disruption.

Our transportation team then delivered the pipework to the site. Our pipefitters and coded welders were then able to start the installation.

Following the plans, we installed the Pipework over many levels of the main University building.

The new Pipework will feed two new plants in 2 more external university buildings. The district supply is part of an ongoing project.

Project Details

Project : Aston University District Pipework

Services Required: Pipework Fabrication, Coded Welding, Installation, Project Management

Customer: Aston University

Aston Uni District Pipework 28
Aston Uni District Pipework 27
Aston Uni District Pipework 26
Aston Uni District Pipework 25
Aston Uni District Pipework 24
Aston Uni District Pipework 23
Aston Uni District Pipework 11
Aston Uni District Pipework 12
Aston Uni District Pipework 13
Aston Uni District Pipework 14
Aston Uni District Pipework 15
Aston Uni District Pipework 16
Aston Uni District Pipework 17
Aston Uni District Pipework 18
Aston Uni District Pipework 19
Aston Uni District Pipework 20
Aston Uni District Pipework 21
Aston Uni District Pipework 22
Aston Uni District Pipework 10
Aston Uni District Pipework 9
Aston Uni District Pipework 8
Aston Uni District Pipework 7
Aston Uni District Pipework 6
Aston Uni District Pipework 5
Aston Uni District Pipework 4
Aston Uni District Pipework 3
Aston Uni District Pipework 2
Aston Uni District Pipework 1
Aston Uni District Pipework
ShareTweet

Filed Under: Projects

Footer

Head Office

Varlowe Industrial Services Limited,
Patrick Gregory Road, Wednesfield, Wolverhampton, Wv11 3du

Phone: 01902 861042
Email: info@varlowe.co.uk

What3Words

what3words address: ///resort.jeeps.recall

Services

  • CNC Machining
  • Coded Welding
  • Commercial Heating Service
  • Electrical Services
  • Industrial Gas Services
  • Pipework Fabrication
  • Steel Fabrication
  • Privacy Policy
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

© 2025 Varlowe Industrial Services Limited - Company Registered in England (04928815)

  • Blog
  • Gallery
  • Projects
  • Get A Quote
  • 01902 861042
  • info@varlowe.co.uk