Coventry District Heating | Friargate

2017-05-04T12:44:40+00:00

Project Description Friargate, Coventry's latest major regeneration project, is making use of the current District Heating energy system. This new project is going to deliver Grade A Office spaces, 2 hotels, Retail/Restaurants/Bars and 400 residential units. Varlowe has been drafted in to route new district pipework to the 25 building, 3,200,000 sq ft mixed [...]

Birmingham Energy Centre | New Street Station

2017-05-03T12:33:07+00:00

Project Description With the expansion and complete renovation of the Birmingham’s New Street station completed, Qsustain and Network Rail identified more power would be needed to efficiently run the station. They agreed on the option of a combined heat & power (CHP) scheme with options of connecting into the district heating system. Using this [...]

May Farm Condensate Catch Pot

2017-04-28T11:25:05+00:00

Project Description G's Growers Littleport Mushrooms LLP 2.5 megawatt anaerobic digestion plant provides renewable energy from using organic waste from the companies crops. Alkane Energy identified that the biogas that feeds the CHP (Combined Heat and Power Unit) was producing more condensate than the current catch pot could cope with. There existing pipe run of [...]

Birmingham District Heating

2017-04-28T12:04:29+00:00

Project Description District energy systems have numerous environmentally friendly benefits, they are a sustainable, cost effective solution to provide heating, cooling and power. Varlowe have been working with Cofely, (who are the UK’s largest providers of Direct Energy schemes) for a number of years, which has lead to projects such as Coventry City's district [...]

Birmingham City Library Plant Room

2017-04-28T12:18:30+00:00

Project Description A few pictures from the work we have been doing over the festive period at Birmingham City Library. Project has included on site Pipework Fabrications, Prefabricated Pipework Installations, Welding and painting.n   Project Details Project: Birmingham Library Services Required: Design, Manufacture, Delivery, Installation, Project Management Project [...]

Aston University, District Pipework

2017-04-28T15:12:16+00:00

Project Description A new spine of flow and return constant temperature pipework for the district supply, fabricated and installed for Aston University. We pre-fabricated 200m of 8" pipework and installed it over multiple levels of the main University building. This will be feeding 2 new plants in 2 more external buildings of the university, [...]